Search This Blog

Translate

Blog Archive

Middleboro Review 2

NEW CONTENT MOVED TO MIDDLEBORO REVIEW 2

Toyota

Since the Dilly, Dally, Delay & Stall Law Firms are adding their billable hours, the Toyota U.S.A. and Route 44 Toyota posts have been separated here:

Route 44 Toyota Sold Me A Lemon



Showing posts with label Cape Cod Bay Watch. Show all posts
Showing posts with label Cape Cod Bay Watch. Show all posts

Sunday, April 2, 2017

Yucca? NO!




It should provide great reassurance that the current Energy Secretary Rick Perry when running as a pResidential candidate proposed closing several federal agencies and couldn't remember the name of one - the Energy Dept. 

His 2 predecessors at the Energy Dept. were Nuclear Physicists, one a Nobel Prize winner. 

The Dancing Clown is in charge of Nuclear Power Plants and Nuclear Weapons.





Sheila Parks: 
Some solution - moving the most toxic waste on the planet in containers across the country.
“Pilgrim’s waste clearly cannot stay where it is,” said Karen Vale, a member of Cape Cod Bay Watch. “Right now it is extremely close to the shoreline and rising seas, but the plan to get it where it needs to go also has to be seriously considered.”
"Vale said a plan developed in 2002 called for transporting the waste from Plymouth to Boston on barges, and from Boston to Nevada on trains.
“Accidents can happen — but the Department of Energy never analyzed the consequences of a spill in our waterways,” Vale said. “This plan for transport puts the entire ecosystem of Cape Cod Bay and the economy of Massachusetts at risk.”



”


State Sen. Viriato "Vinny" deMacedo had believed the door was forever closed on Yucca Mountain as the solution to long-term storage of the
CAPECODTIMES.COM

Senator supports moving spent nuclear fuel from Pilgrim



By Christine Legere 

State Sen. Viriato “Vinny” deMacedo had believed the door was forever closed on Yucca Mountain as the solution to long-term storage of the nation’s highly radioactive spent nuclear fuel, when the Obama administration stopped the flow of federal dollars to the project in 2010.
Now, 30 years after the initial targeting of the Nevada site situated 100 miles northwest of Las Vegas, the door once again opened a crack with President Donald Trump’s inclusion of $120 million for project licensing in his federal budget blueprint.
DeMacedo sees it as an opportunity for the region to get several tons of fuel, now stored at the Pilgrim Nuclear Power Station, out of Plymouth, and he has penned a letter to President Trump supporting the initiative, which he hopes other legislators in the region will sign.
“This is a good step in the whole drama, and I think my colleagues should be encouraged,” said deMacedo, R-Plymouth. While conceding tension exists among legislators due to the current political climate, the state representative added, “This is something we can all support.”
Plymouth, like host communities across the country, has been grappling with the problem and dangers of onsite fuel storage at Pilgrim, where there are currently more than 4,000 highly radioactive spent fuel assemblies housed in the reactor, a massive spent fuel pool, and outside in steel-lined concrete casks.
“The town of Plymouth is America’s Hometown,” deMacedo writes to the President. “Because of the federal government’s failure to comply with the (Nuclear Waste Policy Act of 1982,) Plymouth is a de facto nuclear waste storage site.”
The Pilgrim plant is set to close on May 31, 2019. Under the Nuclear Waste Policy Act, the federal government was committed to removing waste fuel from the nation’s reactor sites by 1998.
Source: Nuclear Regulatory Commission | Interactive map: Gregory Bryant / Cape Cod Times


DeMacedo and other area legislators want to see the Pilgrim site cleared of buildings and radioactive material, including the spent fuel, as quickly and safely as possible.
State Rep. Sarah Peake, D-Provincetown, said Thursday she’ll gladly sign the letter. “We have to put public safety above politics,” Peake said. “I think it’s important to move the spent fuel rods to a facility specifically constructed to handle nuclear waste, and to get them off Cape Cod Bay.”
Other legislators, like Sen. Julian Cyr, D-Truro, still had the letter under review.
When the funding dried up several years ago, the Nuclear Regulatory Commission was in the process of considering a license application for Yucca Mountain.
“Much of the review was done but a hearing had not yet been held,” NRC spokesman Neil Sheehan said. “It is a multiyear review process. At this point, no one knows exactly where it will end up.”
On behalf of Entergy, Pilgrim’s owner-operator, Patrick O’Brien wrote in an email that the company is “encouraged by the administration’s proposal to revisit federal spent fuel management and will continue to follow it closely.”
“Be it Yucca mountain or another interim solution, the federal government must live up to its legal obligation, set forth in the Nuclear Waste Policy Act of 1982, to manage the nation’s used fuel,” O’Brien said.
David Lochbaum, director of the Nuclear Safety Project for the Union of Concerned Scientists, said there is no way to predict whether the Yucca Mountain nuclear repository will ever be completed. “The House seems on board, but the Senate seems more interested in interim storage, especially for plants that have been shut down,” Lochbaum said.
The NRC has an application under review for an above-ground interim storage facility in West Texas to fill the gap. The agency also expects an application shortly for an underground interim storage facility in New Mexico.
Lochbaum pointed out pushback from residents and Nevada legislators that successfully halted the pursuit of Yucca Mountain in 2010 will likely start up again.
“I was at a conference recently with some folks from Nevada,” Lochbaum said. “They say Yucca is dead; it’s a zombie. If it rises again, they’ll whack it down.”
Pilgrim watchdog Mary Lampert, director of the citizens group Pilgrim Watch, agrees with deMacedo that “Pilgrim’s mountain of highly toxic, long-lived spent nuclear fuel would be far safer stored in a permanent storage facility located deep underground so that it will be isolated for the tens of thousands of years it will be toxic — than on the shores of Cape Cod Bay.”
In any case, the full build-out of Yucca, if it secures a license, is several years down the road.
If it is successfully constructed, there will then be the problem of transporting 79,000 metric tons of nuclear waste already generated nationwide to Nevada.
“Pilgrim’s waste clearly cannot stay where it is,” said Karen Vale, a member of Cape Cod Bay Watch. “Right now it is extremely close to the shoreline and rising seas, but the plan to get it where it needs to go also has to be seriously considered.”
Vale said a plan developed in 2002 called for transporting the waste from Plymouth to Boston on barges, and from Boston to Nevada on trains.
“Accidents can happen — but the Department of Energy never analyzed the consequences of a spill in our waterways,” Vale said. “This plan for transport puts the entire ecosystem of Cape Cod Bay and the economy of Massachusetts at risk.”
The Nuclear Energy Institute, the trade organization that represents the nuclear industry, fully supports completing the scientific and engineering study of Yucca.
“Energy Secretary Rick Perry toured the Yucca Mountain Repository earlier this week,” NEI spokesman Matthew Wald said. “We take that as evidence that the administration is serious.”

  • William Maurer
  •  
As much as I'd like to see Pilgrim's spent nuclear fuel stored safely and far away from here, Yucca Mountain Spent Nuclear Fuel Repository is nothing more than a fancy name for a waste storage/disposal solution called 'land filling' and I hope we all know how unsuccessful that is. It's an antique technology and sensibility that is no longer practiced for domestic waste, never mind hazardous waste. The problems experienced with underground storage at Hanford Nuclear Reservation in Washington State (container degradation) and the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico (accidental releases) should be fair warning. And then there's the problem of safe transport. The genie is out of the bottle.

  • Mary Greetham
  •  
In the early 80's, everyone knew then a place was needed to store the spent fuel rods - but yukka was prone to earth quakes. Almost 40 years later and earthquake science hasn't changed but the number of fuel rods needing storage has. Rocket science. What's in your back yard? Plymouth Nuclear is in mine and there's really no evacuation plan in place for an emergency either. Why would any senator want to send his state's hazard to another state? Money? Shut it down.

  • Mary Greetham
  •  
  • Rank 1401
@Mary Greetham This isn't new. Cape Cod Times is leaving decades of their reporting out of the mix here. It's been festering for decades on the fuel rod storage issue for sure, easily 30 years, bur as far as hazardous leakage , maybe less than a decade if we go easy. 
Ask anyone that worked there. They will tell you it was a minimal leak because they need their job. Just google this place. It's a nightmare without the feds getting involved,.



Thursday, February 11, 2016

Cape Cod Today: NRC: Pilgrim nuclear faces possible escalated enforcement action



Entergy continues to prove they are incapable of safely managing nuclear energy facilities. 
See the recent radiation leaks at Indian Point. 



NRC: Pilgrim nuclear faces possible escalated enforcement action

Security guard failed to perform over 200 fire watches, falsified records
- See more at: http://www.capecodtoday.com/article/2016/02/11/227988-NRC-Pilgrim-nuclear-faces-possible-escalated-enforcement-action#sthash.zVTFa7i5.dpuf
















The Nuclear Regulatory Commission (NRC) announced Wednesday that Pilgrim Nuclear Power Plant in Plymouth will likely face escalated enforcement actions following a recently completed investigation.
The enforcement is the result of an investigation into a security matter at the Entergy-owned nuclear facility. The NRC Regional I Field Office initiated the investigation on November 14, 2014, according to a letter from the NRC to Pilgrim.
The investigation was into a security officer who was alleged to have failed to conduct scheduled fire watch tours and falsified fire watch logs. In all, the security guard who was not identified, falsified more than 200 log entries during a two-year period (June 1, 2012 to June 26, 2014), the letter said. The guard initially denied falsifying the records, but eventually admitted to having done so. NRC identified two apparent violations.
“The failure to conduct scheduled fire watch tours could have delayed detection of fire,” the letter said.
According to NCR, no other security officers or security supervisors were cited during the investigation.
Having found evidence to support the failed fire watch allegations, the NRC is considering escalated enforcement actions. Pilgrim will have the option of accepting the violations as outlined by NRC in the letter or requesting a pre-decisional enforcement conference or requesting an alternative dispute resolution.
As Pilgrim had conducted their own investigation and took corrective actions, the plant is not likely to face a civil penalty, the letter said.
Should Pilgrim request either a pre-decisional enforcement conference or an alternative dispute resolution, the public will be notified of the dates and the outcome, but will not be admitted to the hearings.
The Nuclear Regulatory Commission (NRC) announced Wednesday that Pilgrim Nuclear Power Plant in Plymouth will likely face escalated enforcement actions following a recently completed investigation.
The enforcement is the result of an investigation into a security matter at the Entergy-owned nuclear facility. The NRC Regional I Field Office initiated the investigation on November 14, 2014, according to a letter from the NRC to Pilgrim.
The investigation was into a security officer who was alleged to have failed to conduct scheduled fire watch tours and falsified fire watch logs. In all, the security guard who was not identified, falsified more than 200 log entries during a two-year period (June 1, 2012 to June 26, 2014), the letter said. The guard initially denied falsifying the records, but eventually admitted to having done so. NRC identified two apparent violations.
“The failure to conduct scheduled fire watch tours could have delayed detection of fire,” the letter said.
According to NCR, no other security officers or security supervisors were cited during the investigation.
Having found evidence to support the failed fire watch allegations, the NRC is considering escalated enforcement actions. Pilgrim will have the option of accepting the violations as outlined by NRC in the letter or requesting a pre-decisional enforcement conference or requesting an alternative dispute resolution.
As Pilgrim had conducted their own investigation and took corrective actions, the plant is not likely to face a civil penalty, the letter said.
Should Pilgrim request either a pre-decisional enforcement conference or an alternative dispute resolution, the public will be notified of the dates and the outcome, but will not be admitted to the hearings.
The Nuclear Regulatory Commission (NRC) announced Wednesday that Pilgrim Nuclear Power Plant in Plymouth will likely face escalated enforcement actions following a recently completed investigation.
The enforcement is the result of an investigation into a security matter at the Entergy-owned nuclear facility. The NRC Regional I Field Office initiated the investigation on November 14, 2014, according to a letter from the NRC to Pilgrim.
The investigation was into a security officer who was alleged to have failed to conduct scheduled fire watch tours and falsified fire watch logs. In all, the security guard who was not identified, falsified more than 200 log entries during a two-year period (June 1, 2012 to June 26, 2014), the letter said. The guard initially denied falsifying the records, but eventually admitted to having done so. NRC identified two apparent violations.
“The failure to conduct scheduled fire watch tours could have delayed detection of fire,” the letter said.
According to NCR, no other security officers or security supervisors were cited during the investigation.
Having found evidence to support the failed fire watch allegations, the NRC is considering escalated enforcement actions. Pilgrim will have the option of accepting the violations as outlined by NRC in the letter or requesting a pre-decisional enforcement conference or requesting an alternative dispute resolution.
As Pilgrim had conducted their own investigation and took corrective actions, the plant is not likely to face a civil penalty, the letter said.
Should Pilgrim request either a pre-decisional enforcement conference or an alternative dispute resolution, the public will be notified of the dates and the outcome, but will not be admitted to the hearings.
The Nuclear Regulatory Commission (NRC) announced Wednesday that Pilgrim Nuclear Power Plant in Plymouth will likely face escalated enforcement actions following a recently completed investigation.
The enforcement is the result of an investigation into a security matter at the Entergy-owned nuclear facility. The NRC Regional I Field Office initiated the investigation on November 14, 2014, according to a letter from the NRC to Pilgrim.
The investigation was into a security officer who was alleged to have failed to conduct scheduled fire watch tours and falsified fire watch logs. In all, the security guard who was not identified, falsified more than 200 log entries during a two-year period (June 1, 2012 to June 26, 2014), the letter said. The guard initially denied falsifying the records, but eventually admitted to having done so. NRC identified two apparent violations.
“The failure to conduct scheduled fire watch tours could have delayed detection of fire,” the letter said.
According to NCR, no other security officers or security supervisors were cited during the investigation.
Having found evidence to support the failed fire watch allegations, the NRC is considering escalated enforcement actions. Pilgrim will have the option of accepting the violations as outlined by NRC in the letter or requesting a pre-decisional enforcement conference or requesting an alternative dispute resolution.
As Pilgrim had conducted their own investigation and took corrective actions, the plant is not likely to face a civil penalty, the letter said.
Should Pilgrim request either a pre-decisional enforcement conference or an alternative dispute resolution, the public will be notified of the dates and the outcome, but will not be admitted to the hearings.
- See more at: http://www.capecodtoday.com/article/2016/02/11/227988-NRC-Pilgrim-nuclear-faces-possible-escalated-enforcement-action#sthash.zVTFa7i5.dpuf



Friday, January 29, 2016

Pilgrim protester Rifkin heads to court February 2






Pilgrim protester Rifkin heads to court February 2

If found guilty, Rifkin could face a jail sentence
- See more at: http://www.capecodtoday.com/article/2016/01/29/227853-Pilgrim-protestor-Rifkin-heads-court-February-2#sthash.mIQvUbpj.dpuf



Outspoken Pilgrim nuclear opponent Paul Rifkin will have his day in court next week. Rifkin was arrested on May 10, 2015 (Mother's Day) at a protest rally at Pilgrim Nuclear Power Plant in Plymouth. It was Rifkin's third arrest at the facility during what has become an annual Mother's Day anti-nuclear rally over the past several years.  
Rifkin is set to appear in Plymouth District Court on Tuesday, February 2. He is the only defendant and will be facing trespassing charges. In May 2013, Rifkin was part of a group of protestors arrested at the plant. During the 2014 trial, Rifkin and his fellow defendants were found guilty and sentenced to a day in jail with time served. The year before, charges were dropped against Rifkin and the other protestors at the trial following their arrest.
If he is found guilty the third time around, Rifkin may not be so lucky and could face up to a year in jail.
In a statement, Rifkin said he has the support of two civil liberties attorneys, Jeff Feuer and Benji Hiller, who have reportedly suggested that Rifkin represent himself at the hearing on Tuesday.
Two community leaders will speak on Rifkin's behalf. Reverend Nell Fields of the Waquoit Congregational Church will testify as a character witness. State Senator Dan Wolf (D-Harwich) will also speak on Rifkin's behalf. Wolf is also a diehard Pilgrim protestor.
The hearing is set to begin at 9 a.m. on Tuesday at the Plimoth District Court House on Obery Street.
- See more at: http://www.capecodtoday.com/article/2016/01/29/227853-Pilgrim-protestor-Rifkin-heads-court-February-2#sthash.mIQvUbpj.dpuf



Saturday, November 14, 2015

5 violations found in quarterly review of Pilgrim nuclear plant




  • 5 violations found in quarterly review of Pilgrim nuclear plant

  • All the infractions were considered of low safety impact, according to the Nuclear Regulatory Commission.

  • By Christine Legere
    clegere@capecodonline.com

    Posted Nov. 14, 2015 at 2:00 AM
    Updated at 7:01 AM 


    PLYMOUTH — During April’s refueling at Pilgrim Nuclear Power Station, 10 contracted workers entered the main condenser of the reactor to deal with a faulty gasket without wearing the proper protective gear.
    The plant’s radiation technician said he believed the workers were simply measuring the gasket. But after measuring it, they proceeded to cut it out in order to replace it.
    As they left the condenser area, their personal contamination monitors sounded the alert.
    All 10 were decontaminated, and after full body measurement of radiation levels, five were found to have low levels of radioactive contamination. Although those levels were far lower than what is allowable in the course of a year, the workers were monitored for the next several days.
    A later check of contamination levels in the area of the joint gasket showed workers, who had worn a single set of protective clothing, should also have been equipped with respirators. Lack of discussion of the full scope of work between the plant’s radiation protection technician and the work crew was blamed for the unintended exposure.
    That was one of five violations picked up in an analysis of Pilgrim’s performance during the third quarter of this year. All infractions were considered of low safety significance.
    Also on the list were control room alarm panel failures on three occasions in February and May. Nuclear Regulatory Commission inspectors determined the plant personnel failed to monitor the alarm system adequately enough to ensure it would perform its intended function.
    Federal inspectors determined plant personnel failed to perform required testing on a second emergency diesel generator within 24 hours of the time the first emergency generator was found to be inoperable.
    According to NRC spokesman Neil Sheehan, another infraction involved the failure of plant personnel to adequately assess the operability of the plant’s shutdown transformer. “The transformer was incorrectly identified as operable even though that was not the case because of changes to an off-site power line that feeds the transformer,” Sheehan wrote in an email.
    A final infraction was related to the alteration of an off-site power line without first securing the required NRC approval.
    The commission released the report Friday. Entergy, Pilgrim’s owner and operator, has 30 days to contest the findings.
    Entergy spokesman Patrick O’Brien did not return calls seeking comment.

  • http://www.capecodtimes.com/article/20151114/NEWS/151119696/101015/NEWSLETTER10
    0

Saturday, November 8, 2014

EPA to hear feedback on Pilgrim water intake system





EPA to hear feedback on Pilgrim water intake system


By CHRISTINE LEGERE Posted Nov. 7, 2014 @ 9:00 pm
Updated at 9:01 PM


PLYMOUTH -- The state Department of Environmental Protection has scheduled a public hearing for 10 a.m. Nov. 18 at Plymouth Town Hall to gather comments on a plan to build a secondary water intake system in Cape Cod Bay for the Pilgrim Nuclear Power Station. The secondary system would provide backup if needed to lower temperatures in the reactor during “beyond design events” such as extreme storms, earthquakes or other occurrences.

Several conservation groups in the area have opposed the application, filed by Entergy Corp., owner-operator of the Plymouth plant, saying it would further damage Cape Cod Bay and negatively affect marine life.

“What Entergy seeks via the application is ultimately a license to contaminate the tidelands and Cape Cod Bay with a massive amount of radiologically contaminated seawater. The application fails to describe what will happen with the seawater once it is used in the emergency situation for cooling -- in fact, the contaminated water will be released directly into the environment, including the tidelands,” wrote Meg Sheehan, attorney for Cape Cod Bay Watch, in a comment letter to EPA officials.





CHRISTINE LEGERE


http://www.capecodtimes.com/article/20141107/NEWS/141109670/101015/NEWSLETTER100